The list for The Towers repairs 2011 was sent as an Excel spread sheet in 2011, which is a great improvement. I have been busy, so I only queried the things that really stood out. Below is a copy of the queriers

Order Ref Raised Comp Description Inv
621636/1 23/03/2010 15 Apr 2010 CCTV attached to the IRS system £1,260.00

In the letter dated 1 April 2010 where this was discussed the purpose of this was to allow residents to view visitors on their TV set before allowing access. I can not find a CCTV channel on the IRS system.

Order Ref Raised Comp Description Inv
627181/1 27/04/2010 27 Apr 2010 EMERGENCY LIGHTING:RENEW SELF CONTAINED FITTING £1,080.30

This seems very high, what do we get for this?

renew ramp to bin stores 1500mm x 64″ top made of 1″ ply. 2″x2″ x 10m needed to make frame. to be made on site as floor is not level£177.28

Order Ref Raised Comp Description Inv
636744/1 01/07/2010 28 Jul 2010 renew ramp to bin stores 1500mm x 64″ top made of 1″ ply. 2″x2″ x 10m needed to make frame. to be made on site as floor is not level £177.28
636744/2 02/07/2010 5 Jul 2010 renew ramp to bin stores – paint in anti-slip paint. (painter).   cp appt to make 29/7 £50.65
641199/1 29/07/2010 27 Aug 2010 Paint new ramp with non-stick paint. Ramp is by the bin stores. £623.68

Again this seems high,£623.68 to paint a ramp?

Popularity: 3%

Tags:

One Response to “ Service Charge Queries 2011 for The Towers ”

  1. Acer Laptop Battery on February 19, 2012 at 14:30

    Ahaha the Stevenage fans \”He looks like a chimp, he looks like a chimppp, Gareth Bale he looks like a chimp\”